Pages

Friday, September 14, 2012

Tub photos: Bathroom Renovation Project 3

I'm sure I will write at more length about the tub. But for the moment, here are the photos. Posting for Dan the Man, my brother, who is our contractor.

First glimpse. Exciting!


View of the tub, showing the drain and overflow drain, where the tower drain will attach to the tub. Interestingly, because we chose a freestanding assembly, this is the only point where the plumbing will attach to the tub:


View of the back, showing the cutout in the base, where the drain will exit the bottom of the tub:



And, coup de gras, the view of the tub one will most often see inside the bathroom, after it's installed. So beautiful. How we get it upstairs -- that will be another story.



No comments:

Post a Comment