A lot of progress on Tuesday, though I wasn't around most of the day. Here we see the continued process of leveling the floor. Here, a 2x4 cut and nailed to the top of a joist at the level of the new floor:
And all the water lines put in. So elegant, compared to the rat's nest that we took out.
And last, the medicine cabinet came out, and the position of the new one drawn in on the wall just left of it.
A full day's work.
Great job on the installation of water lines! It’s all precisely set up. It’s a smart idea that the pipes were elevated from the ground. That way, you’ll prevent those pipes from freezing during extremely cold weather. Plus, any damaged pipes would be easier to repair because you don’t have to dig down the ground.
ReplyDelete